The open cab dorr on the 5635 is a clear sign that the crew is just about ready to go. Ten minutes later L516 was on its was back to Stevens Point. |
Date:
8/3/2010 |
Location:
New Brighton, MN Map ![Show New Brighton on a rail map](/images/map_us.gif) |
Views:
273 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Douglas Hildebrandt |
Locomotives: |
Author: Douglas Hildebrandt
|
![Ready to go](http://s3.amazonaws.com/rrpa_photos/59944/CN%205635%208-3-2010%20New%20Brighton.jpg) |
Picture Categories: |
This picture is part of album: Wisconsin Central-Minneapolis 9 |